TABLE OF CONTENTS
Background of the Project
Project Scope and Programme
Purpose of the Manual
Project Organisation
Introduction
Air Quality Parameters
Monitoring during Construction Phase
Monitoring during Operation Phase
Introduction
Mitigation Measures for Construction Phase
Mitigation Measures for Operation Phase
Introduction
Proposed Mitigation Measures
Removal of Underground Fuel Tank
Further Site Investigation
Mitigation Measures during Construction Stage
Introduction
Baseline Monitoring
Event and Action Plan
Mitigation Measures
Introduction
Noise Parameters
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Event and Action Plan
Mitigation Measures
Introduction
Mitigation Measures
Site Inspections
Compliance with Legal and Contractual Requirements
Environmental Complaints
General
Baseline Monitoring Report
Monthly EM&A Reports
Quarterly EM&A Summary Reports
Final EM&A Review Reports
Data Keeping
Interim Notifications of Environmenal Quality Limit Exceedances
Electronic Reporting of EM&A Information
List of
Tables
Table
2.1 Action/Limit
Levels for Air Quality
Table
2.2 Event/Action
Plan for Construction Air Quality
Table 3.1 Proposed
Contamination Classifications for Ash Waste
Table 5.1 Event
and Action Plan for Visual Impact - Construction Phase
Table 5.2 Proposed
Visual Mitigation Measures for Construciton Phase
Table 5.3 Proposed
Visual Mitigation Measures for Operation Phase
Table 6.1 Action
and Limit Levels for Construction Noise
Table 6.2 Event/Action
Plan for Construction Noise
List of Figures
Figure 1.2 Project
Organization and Line of Communication
Figure 2.1 Locations
of Air Quality Monitoring Stations
Figure 6.1 Location
of Construction Noise Monitoring Station
Figure 8.1 Environmental
Compliant Flow Diagram
List of Appendices
Appendix A Implementation
Schedule of Recommended Mitigation Measures
Appendix C Sample
Template for the Interim Notification