TABLE OF CONTENTS

 

 

 

1.         INTRODUCTION

Background of the Project

Project Scope and Programme

Purpose of the Manual

Project Organisation

 

2          AIR QUALITY

Introduction

Air Quality Parameters

Monitoring during Construction Phase

Monitoring during Operation Phase

 

3.         waste management

Introduction

Mitigation Measures for Construction Phase

Mitigation Measures for Operation Phase

 

4          Land Contamination

Introduction

Proposed Mitigation Measures

Removal of Underground Fuel Tank

Further Site Investigation

Mitigation Measures during Construction Stage

 

5          visual impact

Introduction

Baseline Monitoring

Event and Action Plan

Mitigation Measures

 

6          Noise

Introduction

Noise Parameters

Monitoring Equipment

Monitoring Locations

Baseline Monitoring

Impact Monitoring

Event and Action Plan

Mitigation Measures

 

7          WAter quality

Introduction

Mitigation Measures

 

8          ENVIRONMENTAL AUDITING

Site Inspections

Compliance with Legal and Contractual Requirements

Environmental Complaints

 

9          REPORTING

General

Baseline Monitoring Report

Monthly EM&A Reports

Quarterly EM&A Summary Reports

Final EM&A Review Reports

Data Keeping

Interim Notifications of Environmenal Quality Limit Exceedances

Electronic Reporting of EM&A Information

 

 

List of Tables

 

Table 2.1        Action/Limit Levels for Air Quality

Table 2.2        Event/Action Plan for Construction Air Quality

Table 3.1        Proposed Contamination Classifications for Ash Waste

Table 5.1        Event and Action Plan for Visual Impact - Construction Phase

Table 5.2        Proposed Visual Mitigation Measures for Construciton Phase

Table 5.3        Proposed Visual Mitigation Measures for Operation Phase

Table 6.1        Action and Limit Levels for Construction Noise

Table 6.2        Event/Action Plan for Construction Noise

 

 

List of Figures

 

Figure 1.1       Site Location Plan

Figure 1.2       Project Organization and Line of Communication

Figure 2.1       Locations of Air Quality Monitoring Stations

Figure 6.1       Location of Construction Noise Monitoring Station

Figure 8.1       Environmental Compliant Flow Diagram

 

 

List of Appendices

 

Appendix A        Implementation Schedule of Recommended Mitigation Measures

Appendix B       Data Record Sheet

Appendix C       Sample Template for the Interim Notification